Power Minerals Ltd (ASX:PNN) Returns Further High-Grade Niobium and REE Results

4 minutes read

10 November 2025

Price Sensitive Announcement $

Highlights:

▪ Latest assays from a 1,000m shallow auger drilling program at the Santa Anna Project in Brazil have returned high-grade results including:
o 1m at 13,590 ppm (or 1.36%) Nb2O5 from 8m in drillhole MN-TM009
o 14m at 2,791ppm Nb2O5 from surface to EOH, including 2m at
5,936ppm Nb2O5
from 9m in drillhole MN-TM-01
o 1m at 2,212ppm Nb2O5 from 7m in drillhole MN-TM-007
o 17m at 6,895ppm TREO from surface to EOH, including 9m at
10,097ppm (or 1.01%) from surface and 5m at 13,824ppm (or
1.38%) TREO
from 2m in drillhole MN-TM-008
o 8m at 5,364ppm TREO from surface, including 4m at 6,204ppm
TREO f
rom 2m in drillhole MN-TM-009
o 13.75m at 6,534ppm TREO from surface to EOH, including 3m at
9,181ppm (or 0.92%) TREO
from 2m in MN-TM-007
o 3m at 6,346ppm TREO from 1m in drillhole MN-TM-006
o 11m at 3,800ppm TREO from surface to EOH, including 2m at
7,437ppm TREO from 2m in drillhole MN-TM-005
o 4m at 8,849ppm TREO from 2m, including 1m at 10,993ppm (or
1.01%) TREO from 5m in drillhole MN-TM-010
▪ In parallel, Power is set to commence a 10,000m RC drilling program at Santa Anna to extend the project’s mineralised footprint east and south-east of initial drilling, targeting niobium and REE in untested areas of the Santa Anna Alkaline Complex
▪ Initial 2,000m of RC drilling is expected to start in November 2025, with completion expected in Q1 2026
▪ Power’s drilling aims to deliver the first Mineral Resource Estimate for the Santa Anna alkaline carbonatite complex
▪ Consistent grades received from drilling to date indicate a potential high grade and advanced critical mineral exploration opportunity
▪ The shallow auger drilling contains many mineralised intercepts from surface, indicating no significant overburden at these sites.
▪ Power holds a binding option over the entire recently discovered (2023) alkaline carbonatite complex within the Goiás State, central Brazil

Overview:

Power Minerals Limited has reported the latest results from its 1000m shallow auger drilling program at Santa Anna, Brazil.

Highlight niobium results include:
▪ 1m at 2,212ppm Nb2O5 from 7m in drillhole MN-TM-007;
▪ 1m at 13,595 ppm (or 1.36%) Nb2O5 from 8m in drillhole MN-TM-009
▪ 14m at 2,791ppm Nb2O5 from surface to EOH, including 2m at 5,936ppm Nb2O5 from 9m in drillhole MN-TM-010

Highlight rare earth element (REE) results include:

▪ 17m at 6,895ppm total rare earth oxide (TREO) from surface to EOH, including 9m at 10,097ppm from surface and 5m at 13,824ppm (or 1.38%) TREO from 2m in drillhole MN-TM008;
▪ 8m at 5,364ppm TREO from surface, including 4m at 6,204ppm TREO from 2m in drillhole MNTM-009;
▪ 13.75m at 6,534ppm TREO from surface to EOH, including 3m at 9,181ppm (or 0.92%) TREO
from 2m in MN-TM-007;
▪ 3m at 6,346ppm TREO from 1m in drillhole MN-TM-006;
▪ 11m at 3,800ppm TREO from surface to EOH, including 2m at 7,437ppm TREO from 2m in drillhole MN-TM-005; and
▪ 4m at 8,849ppm TREO from 2m, including 1m at 10,993ppm (or 1.01%) TREO from 5m in drillhole MN-TM-010.

Power’s auger drilling program is following up its recently completed maiden 29-hole, 2,272m reverse circulation (RC) drilling program at the Santa Anna Project1 and is designed to extend the Project’s mineralised footprint to the east and south-east of initial drilling, targeting shallow niobium and REE in unexplored areas of the Santa Anna Alkaline Complex.

Results from Power’s auger and RC drilling to date continue to build confidence towards achieving its near-term Project goal of confirming a significant Mineral Resource Estimate (MRE).

The auger drilling is continuing, and Power’s extensive 10,000m RC drilling is expected to commence in the current month, with an initial 2,000m of reverse circulation (RC) drilling. Completion of the initial stage is expected in Q1 2026.

Company Notes:

“Latest results from our ongoing auger drilling at Santa Anna continue to validate our exploration model and provide confidence about the potential of this project, as we compile drill data to define a maiden Mineral Resource Estimate for the project, which we hope will be substantial.

Having already announced our next phase of drilling for Santa Anna, a major reverse circulation campaign of up to 10,000m, we are looking to rapidly advance our understanding of this project’s geology. The initial 2,000m of RC drilling is due to commence this month, with assay results and further drilling planned to systematically follow over the coming months.”

Power Minerals Managing Director Mena Habib

Full ASX Announcement: https://hotcopper.com.au/threads/ann-further-near-surface-high-grade-niobium-and-ree-results.8874979/

Leave a Reply

Your email address will not be published. Required fields are marked *